Costain
CThe project to construct a new membrane bioreactor to treat combined primary treated flows from Wigan and Skelmersdale WwTW’s to meet EA regulatory output dates in March 2030.
The project briefly comprises a major reinforced concrete structure approx. 140m x 120m with walls up to 10m high on piled foundations and other associated structures such as chemical dosing plants and MCC kiosks/transformers. Approximately 20,000m3 concrete will be needed for the main structure. Significant mechanical and electrical pipework and equipment will be installed along with diversion of critical assets.
The role will be site based
At Costain, we believe diverse perspectives drive innovation. If you’re passionate about making a positive impact and think you can bring value to our team, we’d love to hear from you even if you don’t tick every box. Your unique skills and experiences could be exactly what we need.
#LI-KP1
Undertake CTRM inspections of the site, specifically relating to lifting on a regular basis to ensure all lifting operations being undertaken in line with the lift plans/permits
Review and approval of all supply chain lift plans inc. issuing permits to lift
Mentor less experienced Lift AP’s in the Engineering team
Own and update lift plan register and lifting permit register
Prepare and maintain lift plans for all self delivery works and issue lift permits
Produce and maintain lifting equipment register
Produce and brief RAMS for self delivery lifting activities
Allocate duties and make appointments for all lifting personnel on site inc. maintaining a register
Review RAMS that include lifting operations
Knowledge, Skills and Experience
Essential
10+ years civil engineering
Review and approval of lift plans for a wide range of lifting appliances
Able to produce and brief lift plans for a wide range of lifting appliances
Desirable
Experience of tower cranes
CPCS Appointed Person Lifting (Blue Card)
SSSTS or SMSTS
Full UK Driving Licence
Desirable
CPCS Temporary works supervisor